• 1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
  • 1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
  • 1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
  • 1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
  • 1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
  • 1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center

1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center

Phase: Single Phase
Type: On-line
Protection: Overcurrent
Application: Communication
Classification: Lighting/Power
Standby Time: Standard Machine
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
CX 2K~3K Series Online UPS 2000va 3000VA
Standby UPS
Sine Wave Output UPS
Output Capacity
Minitype
Equipment Mode
Centralized Model
Brand
Customization
Transport Package
Carton Box
Specification
448*192*341mm (L*W*H)
Trademark
ZLpower or OEM
Origin
China
HS Code
8504403090
Production Capacity
18000pieces/Month

Product Description

Product Description

UPS Battery Backup and Surge Protector, 2000VA 1600W 3000VA 2400W Backup Battery Power Supply Back-UPS

CX series high frequency online UPS is specially designed for servers, data-center critical network devices, sensitive electronic equipment, telecom, bank, hospital, bureau, traffic, public security,ATM and so on.


Features:
♦ Advanced DSP numerical control technology application, the performance of UPS is more stable, more superior quality.
♦ The load power factor is 0.8
♦ Adopting digital control of active power factor correction technology, make the input power factor above 0.98, to avoid the pollution to power network, achieve energy saving, reduce the investment cost of the system."
♦ A very wide range of input voltage and frequency, even in remote parts of electric power environment is very bad to normal power supply, reduce the number of battery discharge, improve the service life of the battery.
♦ Can match generator to use, Input voltage and frequency range is wide, can effectively isolate the generator of electricity, to provide clean, safe and stable power supply load.
♦ Grid is not stable, UPS power supply mode conversion time is zero, effectively ensure the security and reliability of the load operation.
♦ Smart slot can provide abundant extensible function; can choose to install Winpower, SNMP card

1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
Product Specifications
 

Model

CX2K

C3K

CX2KL

C3KL

Capacity

VA/W

2000VA/1600W

3000VA/2400W

2000VA/1600W

3000VA/2400W

Input

Nominal Voltage

200/208/220/230/240VAC

Voltage Range

115~300VAC

Frequency Range

50Hz : 46~54Hz : 60Hz; 56~64Hz

Harmonic Distortion

<10% (Nonlinear load)

Power Factor

≥0.98

Output

Voltage

200/ 208/ 220/ 230/ 240 (1±1%)VAC

Frequency

50/60Hz (Adjustable);
50Hz AC Mode: Follow AC Mode (AC Range 46~54Hz); Battery Mode: 50Hz (1±0.2%)
60Hz AC Mode: Follow AC Mode (AC Range 56~64Hz); Battery Mode: 60Hz (1±0.2%)

Wave Form

Pure sine wave

Power Factor

0.8

Harmonic Distortion

≤4% (Linear load); ≤7% (Nonlinear load)

Overload Capacity

105%~150%  45S~25S; 150%~200%  25s~300ms; ≥200% 200ms

Current Crest Ratio

31

Connections

IEC320*6

IEC320*3&   Terminal block

IEC320*6

IEC320*3&  Terminal block

Efficiency

Battery Mode

83%

AC Mode

87%

Battery

Type

Sealed free maintenance lead acid battery

Nominal DC voltage

48VDC/72VDC

72VDC

96VDC

Quantity

12VDC×4

12VDC×6

                   12VDC×6/12VDC×8
Back-up Time (Full Load)

5min

4.5min

Depends on requested  Back-up time
Recharge Time

5 hours filling to 90% (standard)

Depends on external  battery capacity (long-term)
Charge Current (MAX)

1.0 A

5.0A

Charge Voltage (VDC)

54.8V±0.4VDC

82.2V±0.6VDC

82.2V±0.6VDC

110±0.6VDC

Bypass

Automatic Transfer

On overload and UPS failure

Before UPS Power-on

Default "ON" user adjustable to "YES"

Transfer Time

 

0ms; less than 4ms from inverter to bypass and vice versa

Indicators

LCD Display

UPS status, Battery capacity, loading, Fault code

Audible Alarm

 

Bypass, battery mode, Battery low, Overload, Fault

Acoustic Noise

At 1 Meter Distance

<50dB

Communications

Intelligent RS232 serial port

Software support Windows family software, Linux, Sun network operating system,
IBM Aix, Compaq True64 SGI IRIX, FreeBSD,HP-UX and MAC

SNMP (Optional)

Remote control UPS through SNMP management and Internet

USB (Optional)

Windows family software and Mac OS

Environmental

 

 

Operating Temperature

0~40ºC

Operating Humidity

20-90% (No condensing )

Physical Parameter

Net Weight (kgs)

17.5

22

9.5

10

L*W*H (mm)

458*192*341



Company Profile

ZLpower Electronics Co., Ltd is a 15 years manufacturer of UPS power inverter & acid battery
1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center


1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center
1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center


Certifications

We have obtained the ISO14001,ISO9001,CE,UL,ETL,CCC certificates

1K/2K/3K/6K/10kVA High Frequency Tower Power Supply Online UPS for Small Data Center

ZLpower Service

OEM Services: 
1.Logo Customization
2.Label Customization
3. Manua Customization
4. Packing  Customization

Payment Terms:
1. T/T ,Western Union,PayPal,L/ at sight,Alibaba Trade Assurance Order acceptable
2. We will arrange the products and shipment within 3-7 working days after receive the payment.

Shipment:
1.By EMS, DHL, FedEx, TNT, UPS or other express.
2.By our forwarding agent (by air or by sea).
3.By your own forwarding agent.
4.By domestic forwarding agents to any city in China.

Lead Time:
1.Sample orders will be delivered from our factory within 7 working days.
2.General orders will be delivered from our factory within 7-15 working days.
3.Big orders will be delivered from our factory within 15-25 working days at most.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Management System Certification
ISO9001:2015, ISO14001:2015
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment