Customization: | Available |
---|---|
After-sales Service: | 2 Years |
Warranty: | 2 Years |
Still deciding? Get samples of US$ 123/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
♦Advanced DSP numerical control technology application, the performance of UPS is more stable, more superior quality. ♦ Adopting digital control of active power factor correction technology, make the input power factor above 0.98, to avoid the pollution to power network, achieve energy saving, reduce the investment cost of the system."
Q1. What's the terms of payment?
A. We accept TT,30% deposit and 70% balance before shipment
Q2. How's the delivery time?
A. usually it will take about 3-5 days for sample and 10-15 days for bulk production
Q 3. What kind of material of transformer?
A. 100% copper which has a long sevice life and higher efficiency.
Q4. Would you accept to use our logo?
A. We would provide free OEM order depends on your quantity
Q5. We want to know month capacity.
A. It depends on different model. Total capacity is up to 10000 pieces.
Q6. Where is your market?
A. Our products are popular all over the world as their cost-effictive perfermance. We hope you can join us and make mutual benefit from our long-term and co-win cooperation.